The fl oor will be fully carpeted with Milliken design essentials omni-directional carpet tiles.
The lift lobbies will have a new large fl oor tile.
The stair core will have new vinyl with new nosings.
WALL
All walls will be decorated white.
All timber frames will be decorated in white.
DOORS AND WINDOWS
Refurbish existing doors.
New doors with horizontal grain oak veneer and modern ironmongery to be fitted.
CEILING
New metal tile ceilings.
Any plasterboard areas will be painted white.
SIGNAGE
Floor number sign to be added to the lift lobby in stainless steel.
MECHANICAL AND ELECTRICAL
Install new LG7 compliant Clearvision Zenn light fi ttings.
New recessed strip lighting in lift lobby.
Test and certifi cation of all existing data cabling.
TOILETS
The WC both male and female will be fully refurbished, with new WC’s, urinals, vanity units, lighting, Mitsubishi Jet Towel dryer and full height mirrors.