FLOOR

  • The fl oor will be fully carpeted with Milliken design essentials omni-directional carpet tiles.
  • The lift lobbies will have a new large fl oor tile.
  • The stair core will have new vinyl with new nosings.

WALL

  • All walls will be decorated white.
  • All timber frames will be decorated in white.

DOORS AND WINDOWS

  • Refurbish existing doors.
  • New doors with horizontal grain oak veneer and modern ironmongery to be fitted.

CEILING

  • New metal tile ceilings.
  • Any plasterboard areas will be painted white.

SIGNAGE

  • Floor number sign to be added to the lift lobby in stainless steel.

MECHANICAL AND ELECTRICAL

  • Install new LG7 compliant Clearvision Zenn light fi ttings.
  • New recessed strip lighting in lift lobby.
  • Test and certifi cation of all existing data cabling.

TOILETS

  • The WC both male and female will be fully refurbished, with new WC’s, urinals, vanity units, lighting, Mitsubishi Jet Towel dryer and full height mirrors.

OTHER AREAS

  • To convert a store room into a shower room.